看见·读懂·共识·行动——写在亚太媒体高端论坛开幕之际

在这里,亚太媒体看见更快更新更开放的大湾区!

亚太媒体高端论坛将在广东举行

关于APEC,外国媒体人和大V这么说

从外国友人手中的“广货好物包”,看广东制造版图|看湾区·看未来

长图H5|欢迎你到广东来

With the super hub coming, will this area become a treasure trove?

发布时间:   来源: GD Today

At 10:50 a.m. on June 30, the Shenzhen-Zhongshan Link was officially opened. The 24-km-long cross-sea link began trial operation at 3 p.m. on the same day. It further promotes the integrated development of the Guangdong-Hong Kong-Macao Greater Bay Area (GBA).

The Wanqingsha branch line of the Nansha-Zhongshan Expressway has been fully connected and traffic is scheduled to start before the end of the year, linking Guangzhou's Nansha district to the Shenzhen-Zhongshan Link.

It will take less than 20 minutes for vehicles to travel from Nansha Port to Shenzhen Bao'an International Airport via the Shenzhen-Zhongshan Link, and less than 15 minutes to Zhongshan city, the hometown of Sun Yat-sen, via the Nansha-Zhongshan Expressway.

With the improved transportation infrastructure, the Zhujiang Subdistrict in Guangzhou's Nansha District is becoming a treasure trove for industrial projects.

Reporter | Wang Yiqing

Video | Yu Yanling, Cheng Yulin

Poster | Ye Yingshi

Text | Monica

Editor | James

Source:GD Today

上一篇:The "six batches" project in Wuhou District attracts high quality and efficiency to help the successful implementation of Beijing Huakong Intelligent Processing Industry Equipment Smart Brain Project
下一篇:ShenZhong Link to significantly benefit extensive business with BYD: GM of Musashi Auto Parts (Zhongshan)

首页   |   

Copyright © http://www.khci.vip/ 英国富中传媒 版权所有